Purpose:
Supervision, monitoring and inspection of total construction activities carried out by contractor on site on behalf of employer in accordance with specification, approved drawings and method statements
Principal Accoutabilities:
• To inspect and record the construction works carried out by contractor on site and resolve the site generated quarries by co-ordinating with CM
• To ensure performance of the work in strict accordance with the drawings and specification.
• Supervision and Inspection of `additional works’ and `out of scope works’ carried out by contractor.
• Process the joint measurement forms and maintain the records of their status.
• Maintain records of completed works for interim and final payment and as-built plans
• Make special notes and document the contractors activities that may lead to claims.
• Be fair and firm in dealings with the contractor. Consider the alternatives and consequences carefully before making decisions.
• Check temperature, compaction, joints and surface of asphalt
• Check all form works, reinforcement etc before concrete pouring
• Co-ordinate and co-operate with Contractors site Foreman for all the activities.
• Adhere to safe working methods and report to CM for any accidents on site.
• Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labour and equipment used etc, and sign at the end of each day.
• Coordinate with the laboratory technician and arrange for sampling and testing of satisfactorily completed work and quality assurance testing of suspect materials.
• Checking the `Day work records’ submitted by contractor
• Supervision and Inspection of all construction activities carried out by contractor on site.
• Maintaining records of site resources, daily progress of work, inspections, construction and workshop drawings, method statements and ITPs (Inspector Testing Plans). Making special notes and document the contract activities that may lead to claims.
• Drafting site instructions for any required variations from, or additions to, the contract documents.
• Report questionable methods of operations by the contractor to the Engineer
تفاصيل الوظيفة
2014-02-27 | تاريخ الإعلان عنها: |
المملكة العربية السعودية | منطقة الوظيفة: |
الهندسة | الدور الوظيفي: |
هندسة | قطاع الشركة: |
المرشح المفضل
متوسط الخبرة | المستوى المهني: |
تقدم الآن - وظائف في السعودية - وظائف في جدة, المملكة العربية السعودية - وظائف في الرياض, المملكة العربية السعودية - وظائف الهندسة في السعودية - بحث عن جميع الوظائف
http://ift.tt/1cprR0D